Takeoff › Deck materials calculator

Deck materials calculator

Enter the size and height of your deck. Takeoff writes the full list — boards, joists, bearers, piles, concrete, brackets, nails, screws and oil — in standard NZ lengths.

Open the deck calculator

Free · no sign-up · works on your phone · NZ sizes

How to work it out

Decking boards

Work out how many rows of boards fit across the deck (board width plus the gap), then how many lengths each row needs. Takeoff plans the joins so they land on joists and adds 10% for waste and offcuts.

Joists

Joists run across the bearers at 450 mm centres for most pine and hardwood decking. Count the joists along the deck, then buy lengths that cover the span without wasting a metre.

Bearers and piles

Bearers sit on piles, usually at around 1.2–1.3 m centres. The number of bearers depends on the joist span you allow. Pile length depends on how high the deck sits.

Fixings

Every joist–bearer crossing needs a fixing, every pile needs a pile fixing, and every board needs two screws or nails at each joist. That is where most hand-written lists come up short.

Worked example

A 6 × 4 m back deck, 600 mm off the ground, in 90 × 19 pine with 4.8 m boards. Everything else is on the default settings.

ItemQty
Decking
Decking boards90×19 Pine H3.2 · Premium · Smooth · 4.8 m lengths · 205.9 lm incl. 10% waste43 lengths
Framing
Joists140×45 H3.2 · 4.8 m · @ 450 mm centres12 lengths
Boundary joists140×45 H3.2 · 4.8 m · Along both long edges of each area2 lengths
Bearers100×100 RS H3.2 · 6.0 m4 lengths
Foundations
Piles125×125 H5 · 750 mm · At 1.3 m centres along each bearer20 piles
Pile concrete20 kg premix concrete bags · 1.1 m³ incl. 10% waste116 bags
Fixings
Decking screwsStainless or galv decking screws · box of 1000 · 983 screws needed1 box
Lumberlok Multigrip38×38×125 · stainless steel · One each time a joist crosses a bearer (+5%)51 multigrips
Lumberlok product nails30×3.15 · stainless · 500 g bag · ≈408 nails, every hole filled (≈250 per bag)2 bags
Lumberlok Ordinary Pile FixingStainless steel · bag of 10 sets (wire dogs + nails) · 20 piles · one set each2 bags
Framing gun nails90×3.15 galv · pack of 1000 · ≈258 nails1 pack
Finish
Decking oilPine deck oil/stain · ≈10 m²/L per coat, 2 coats4 litres

This is the list Takeoff produced for that job. Your list will change with your sizes and settings.

Check before you buy

What the calculator covers

Questions

How many decking boards do I need?

Divide the deck width by the board cover (board width plus the gap) to get the number of rows, then work out how many lengths each row needs. For the 6 × 4 m example on this page that comes to 60 lengths of 4.8 m, 90 mm board, including 10% waste. Takeoff does this for any size.

Do I need stainless steel fixings on my deck?

Takeoff lists stainless brackets and fixings when the bottom of the bearers is less than 600 mm off the ground, in line with NZS 3604. Above that, hot-dip galvanised is the usual choice inland. Near the coast, check the exposure zone for your site.

Do I need a building consent for a deck?

Decks no more than 1.5 m above the ground are generally exempt from consent, but they still have to meet the Building Code. A deck with a fall of 1 m or more needs a barrier. Check with your council if you are unsure.

Get your own list in under a minute

Put in your sizes. Print it, save it as a PDF, email it or take it to your supplier.

Start your decks list

Other calculators