How to work it out
Floor
The subfloor is worked out the same way as the deck calculator — piles, bearers, joists and fixings — with particleboard or ply flooring, adhesive and screws on top. Or pick a concrete slab.
Walls and openings
Each wall is framed at your stud spacing. Every window, door and ranch slider gets trimmers, jack studs, a sill and a lintel sized from NZS 3604 Table 8.9, and the framed opening is the joinery frame plus a 20 mm allowance.
Roof
Trusses are listed with the span, pitch and eaves your truss plant needs. Rafters, ridge and collar ties are cut from standard lengths. Purlins, roofing iron, flashings, underlay, netting, fascia and soffits follow.
Close-in and lining
Cladding, building wrap, cavity battens and flashings are worked out the same way as the cladding calculator, with the joinery openings taken out. Insulation, GIB (including a raked ceiling), skirting, architraves and spouting finish it off.
Worked example
A 6 × 4.2 m sleepout on piles, 500 mm off the ground, with 2.4 m walls, a 20° gable roof on trusses, a 2100 ranch slider and a 1200 × 1200 window at the front and a 900 × 900 window in one end. Weatherboards, corrugate, GIB and insulation. Everything else is on the default settings.
| Item | Qty |
|---|---|
| 1 · Floor | |
| Joists140×45 H3.2 · 4.8 m · @ 450 mm centres | 15 lengths |
| Boundary joists140×45 H3.2 · 6.0 m · Along both long edges of each area | 2 lengths |
| Bearers100×100 RS H3.2 · 6.0 m | 4 lengths |
| Piles125×125 H5 · 750 mm · At 1.3 m centres along each bearer | 24 piles |
| Pile concrete20 kg premix concrete bags · 1.32 m³ incl. 10% waste | 139 bags |
| Lumberlok Multigrip38×38×125 · hot-dip galv · One each time a joist crosses a bearer (+5%) | 63 multigrips |
| Lumberlok product nails30×3.15 · hot-dip galv · 500 g bag · ≈504 nails, every hole filled (≈250 per bag) | 3 bags |
| Lumberlok Ordinary Pile FixingHot-dip galv · bag of 10 sets (wire dogs + nails) · 24 piles · one set each | 3 bags |
| Framing gun nails90×3.15 galv · pack of 1000 · ≈308 nails | 1 pack |
| Particleboard flooring3600 × 1200 × 20 mm T&G particleboard flooring (moisture resistant) · 25.2 m² + 6% · laid across the joists, joints staggered | 7 sheets |
| Flooring adhesiveConstruction adhesive · 375 mL cartridge · ≈1 per 4 m² — a bead on every joist and in the T&G joints | 7 cartridges |
| Flooring screws10g × 50 mm countersunk flooring screws · box of 500 · ≈500 · 150 mm centres at edges, 200 mm in the field | 1 box |
| Ground moisture barrier250 µm polythene · 4 m wide roll, per m² · Laid over the ground under the floor, lapped 75 mm and weighted | 32 m² |
| 2 · Wall framing | |
| 90×45 SG8 H1.26.0 m · Studs, nogs, top plates, trimmers · incl. 2 spare | 31 lengths |
| 90×45 SG8 H1.24.8 m · Studs, nogs, top plates, trimmers | 5 lengths |
| Lintel timber · 2/190×45190×45 SG8 H1.2 · 4.8 m · 2 pieces cut — nail in pairs | 1 lengths |
| Lintel timber · 2/140×45140×45 SG8 H1.2 · 4.8 m · 4 pieces cut — nail in pairs | 1 lengths |
| Framing gun nails90×3.15 galv · pack of 1000 · ≈779 nails | 1 pack |
| 3 · Roof | |
| Gable roof trussesSpan 4.2 m · 20° · 300 mm eaves · 900 mm centres · made to order · Your truss plant designs these — give them this size, pitch, eaves, roofing type and your wind zone | 6 trusses |
| Gable-end trussesSpan 4.2 m · 20° · 300 mm barge overhang · made to order · One each end, framed for the cladding and the barge outriggers | 2 trusses |
| Truss fixingsTruss-to-top-plate brackets (e.g. Lumberlok or MiTek) · hot-dip galv · One each end of every truss — follow your truss plant’s fixing schedule | 16 fixings |
| Purlins · 70×45 SG8 H1.24.8 m · laid flat · 8 rows at ≤900 mm centres, 6.6 m long | 16 lengths |
| Purlin fixings10g × 80 mm self-drilling screw · galv · At every purlin crossing (+10%) — NZS 3604 Table 10.10 for a high wind zone | 71 screws |
| Roof plane bracingGalv strap brace 25 × 1 mm · 30 m roll · Two diagonals on each roof face | 1 rolls |
| Fascia & barge boards200 × 25 H3.1 primed pine · 5.4 m · 13.2 m fascia + 10.2 m barge | 5 lengths |
| Soffit lining4.5 mm fibre cement soffit sheet · 2400 × 1200 · 6.7 m² of eaves and barge soffits | 3 sheets |
| Corrugate roofingCOLORSTEEL® · 0.40 BMT · cut to length · 18 sheets · cutting list: 18 × 2.61 m | 46.98 lm |
| Ridge & hip cappingMade to order · COLORSTEEL® · 6.6 m of ridge · + 5% for laps | 7 lm |
| Barge flashingMade to order · COLORSTEEL® · 4 sloping edges at the gable ends · 10.2 m + 5% | 10.8 lm |
| Roofing screws12g × 65 mm hex head with washer · Class 4 · 5 per sheet at every purlin (900 mm centres) + 10% | 397 screws |
| Flashing fixingsStitching screws or sealed rivets · box of 100 · 62 · about 1 every 300 mm along the flashings | 1 box |
| Thermakraft Covertek 407 roof & wall underlayCTS1250050 · 1250 mm × 40 m roll (50 m²) · heavy duty, self-supporting · 33.7 m² of roof + 10% for laps = 37.1 m² | 1 roll |
| Roof nettingGalvanised or poly roof netting · roll · Run over the trusses or rafters to hold up the underlay · ≈70 m² per roll | 1 roll |
| 4 · Cladding & joinery | |
| Bevelback weatherboard180 × 18 · pre-primed pine H3.1 · 148 mm cover · 49.8 m² ÷ 148 mm cover = 336.5 m + 10% · your merchant works out the lengths (random or finger-jointed) | 371 lm |
| Back soakersBehind every butt join · to suit 180 board · 41 joins (boards ≈5.4 m long) + 10% | 46 each |
| Timber box cornerPrimed pine · 4 corners × 2.6 m + 10% | 12 lm |
| Weatherboard nails100 × 3.15 mm plain shank · hot-dip galv · box of 500 · 617 nails · 1 per board at every stud + 10% | 2 boxes |
| Building wrap (wall underlay)Roll · 56.3 m² of wall + 10% · ≈25 m² per roll after laps | 3 rolls |
| Building wrap tapeFor laps, tears and around openings · Approx. | 1 roll |
| Cavity battens20 mm · H3.1 · e.g. 45 × 20 · On every stud, and beside each opening, + 10% | 124 lm |
| Cavity closer / vent stripAlong the bottom of the cladding and over every opening · 20.4 m of base + opening heads, + 10% | 28 lm |
| Head flashingAluminium · cut to opening width + 50 mm each side · 1 × 2200 mm, 1 × 1300 mm, 1 × 1000 mm | 4.8 lm |
| Flexible flashing tapeSill and jamb tape · 25 m roll · Window sills, jamb corners and door jamb corners | 1 roll |
| Ranch slider2100 × 2000 mm frame · aluminium, double glazed · Stud opening 2120 × 2010 mm — confirm with your joinery maker | 1 unit |
| Window1200 × 1200 mm frame · aluminium, double glazed · Stud opening 1220 × 1220 mm — confirm with your joinery maker | 1 unit |
| Window900 × 900 mm frame · aluminium, double glazed · Stud opening 920 × 920 mm — confirm with your joinery maker | 1 unit |
| Window & door air sealLow-expansion PU window & door foam · 750 mL can · Seals the gap round each frame (with a backing rod) | 1 cans |
| 5 · Insulation & lining | |
| R3.6 ceiling batts≈7.7 m² per pack · 23.2 m² + 5% waste | 4 packs |
| R2.6 wall batts · 90 mm≈11.3 m² per pack · 40.6 m² + 5% waste | 4 packs |
| R2.6 underfloor batts≈10.6 m² per pack · 23.2 m² + 5% waste | 3 packs |
| GIB Standard10 mm · 6000 × 1200 · TE/TE · SKU 12672 | 4 sheets |
| GIB Standard10 mm · 4200 × 1200 · TE/TE · SKU 11542 | 4 sheets |
| GIB Standard13 mm · 4200 × 1200 · TE/TE · SKU 11923 | 5 sheets |
| GIB Grabber screws6g × 32 mm · High Thread (timber) · loose · box of 200 · 299 screws for 10 mm walls | 2 boxes |
| GIB Grabber screws6g × 32 mm · Self Tapping (steel) · loose · box of 200 · 248 screws for 13 mm ceilings | 2 boxes |
| GlueGIBFix One · 375 mL cartridge · 2.6 L needed · ≈4 L per 100 m² | 7 cartridges |
| Paper jointing tapeGIB paper tape · 35.6 m of joints + 29.2 m of corners and angles | 72 lm |
| Jointing compound15 L pail (e.g. GIB Trade Finish Multi) · ≈70 m of joint per pail, all coats | 2 pails |
| GIB Rondo 310 batten35 mm deep · 6.0 m · incl. 1 spare | 7 lengths |
| GIB Rondo 340 perimeter channel3.0 m lengths · 19.6 m of wall/ceiling junction | 7 lengths |
| GIB Grabber wafer head screws8g × 32 mm · needle tip · metal to timber · box of 200 · 136 screws: 96 for battens (2 per truss crossing, through both flanges) + 33 for perimeter channel (≈1 every 600 mm) | 1 box |
| 6 · Spouting & trim | |
| Marley Stormcloud® spoutingWhite · 5 m · MS1.5 | 3 lengths |
| Spouting bracketsWhite · MS2 · Every 500 mm + each end | 30 brackets |
| Spouting joinersWhite · MS5 · Where lengths join | 2 joiners |
| Stop ends · left handWhite · MS3 | 2 stop ends |
| Stop ends · right handWhite · MS4 | 2 stop ends |
| Expansion outletsWhite · 65 mm · MS8-65 · One per downpipe | 2 outlets |
| RP65® downpipeWhite · 3 m lengths · 2 downpipes × ≈3.2 m | 3 lengths |
| RP65® bendsWhite · M+F · 2 per offset + 1 at the bottom | 6 bends |
| RP65® downpipe clipsWhite · First within 200 mm of the bend, then max 1.2 m apart | 8 clips |
| Stainless screwsFor downpipe clips · 2 per clip | 16 screws |
| Stainless screwsFor spouting brackets · 3 per bracket (min. 6g × 20 mm, per Marley) | 90 screws |
| Marley MCS® solvent cementWhite · ≈20 joints · don’t glue into expansion outlets or joiners | 1 tins |
| Primed MDF skirting90 mm · 5.4 m lengths · 17.3 m around the rooms, less doorways · 6 pieces · incl. 1 spare | 5 lengths |
| Primed MDF architrave60 mm · 5.4 m lengths · 1 door + 2 windows · 11 pieces · incl. 1 spare | 5 lengths |
| Brad nails40–50 mm, to suit your nail gun · ≈2 every 600 mm on skirting, every 300 mm on architraves | 184 nails |
| Gap fillerPaintable acrylic · cartridge · ≈1 per 15 m of trim, for joints and the wall line | 3 cartridges |
This is the list Takeoff produced for that job. Your list will change with your sizes and settings.
Check before you buy
- 139 bags of pile concrete is a lot of mixing — a small ready-mix load (1.4 m³) may be cheaper and faster.
- Exemptions (Building Act Schedule 1) for 10–30 m² single-storey buildings: at least 1 m from every boundary and any house, floor no more than 1 m above the ground, no more than 3.5 m high above the floor. Other conditions apply (lightweight materials, who builds it, no plumbing on some routes) and your district plan still applies — check with your council before you start.
- Checked against NZS 3604:2011 — Studs — 90×45 at 600 mm is enough for these wall heights in a high wind zone (Table 8.2). Floor — 140×45 joists at 450 mm span up to 2.6 m (Table 7.1(a)) — yours are 1.65 m; the bearers with piles at 1.3 m carry up to 1.9 m of joists (Table 6.4(a)). Lintels — sized for a light roof with a 2.4 m loaded dimension (Table 8.9): 2120 mm → 2/190×45, 1220 mm → 2/140×45.
- Trusses are designed by your truss plant — give them the span, pitch, eaves and your wind zone. Bracing, fixings and anything outside NZS 3604 still need checking for your site — this is a materials list, not consented plans.
What the calculator covers
- Joists, bearers, studs, lintels, rafters and purlins checked against NZS 3604
- Rectangle or L-shape, with a valley set where the roofs meet
- Internal walls for a bedroom or bathroom, with hinged or cavity slider doors
- Gable or mono-pitch (lean-to) roofs
- Prefab trusses or cut rafters with a raked ceiling
- Timber floor on piles or a concrete slab
- Windows, doors, French doors and ranch sliders in common NZ sizes — or your own
- Floor plan, elevations, section, floor framing, roof framing and every wall frame
- Checks against the 30 m² sleepout exemption — size, floor height and roof height
- Weatherboard or sheet cladding
- GIB or ply lining, batts, spouting and trim
Questions
Do I need a building consent for a cabin or sleepout?
Single-storey detached buildings of 10–30 m² can be exempt under Schedule 1 of the Building Act if they meet the conditions — including at least 1 m from boundaries and houses, a floor no more than 1 m above the ground and no more than 3.5 m high. There are different routes (lightweight materials, kitset, or built by an LBP), each with its own conditions. Check with your council before you start.
How big can a sleepout be without a consent?
Up to 30 m² of floor area under the Schedule 1 exemptions. Takeoff shows the inside floor area as you type and warns you when you go over.
What size are standard windows and ranch sliders in NZ?
Most aluminium joinery is made to order, but common frame sizes include 1200 × 1200 and 900 × 900 windows, 860 × 2000 entry doors, and 1800, 2100 and 2400 wide ranch sliders around 2000–2100 high. Takeoff lists these and lets you enter any size.
Trusses or rafters for a small cabin?
Trusses are quick to stand and give a flat ceiling with room for thick ceiling batts. Rafters give a raked ceiling that makes a small room feel bigger, but need deeper timber for the span and leave less room for insulation.
Get your own list in under a minute
Put in your sizes. Print it, save it as a PDF, email it or take it to your supplier.
Start your cabins & sleepouts list